GAP 15

  • Project:

    GAP 15

  • location:

    Germany

  • Shading Solution:

    External Venetian Blinds

  • Automation System:

    Hard-wired

  • Architect

    JSK Architekten

  • vasatec members

    Faltenbacher Jalousienbau and Vestamatic

Project Details

The GAP 15 is a distinctive 24-storey high-rise located in the center of Düsseldorf, comprising two separate buildings connected by an open, glazed passageway. The complex was designed to include 1,600 workspaces, shops, and restaurants.

 

Vasatec was engaged to replace existing Venetian Blind systems and motors during the renovation of the building. Motors will be supplied to power shading systems installed within the building’s unique double-skin façade.

 

vasatec is committed to providing reliable and robust performance for sun shading systems that operate continuously throughout the day, enhancing the comfort of the occupants in GAP 15.

About Us

All-inclusive project shading solutions.

About